Projects

2011
  • 01/01/2011

    Pascua Lama (P5SL) - Barrick Gold

    • Equipment Type: Vertical In Line Pumps
    • Engineering: FLUor Techint
    • Final Client: Barrick Explotaciones
    • Vendor: Germany&Belgium

  • 01/01/2011

    CLOV OOL

    • Equipment Type: FPSO Receptacles
    • Engineering: SBM Offshore
    • Final Client: TOTAL Angola

  • 01/01/2011

    Minas - Conga

    • Equipment Type: Pumps
    • Engineering: FLUor Techint
    • Final Client: Newmont Minning

 return
Osis Inspection Services
Camino de la Fombica s/n | 33390 Gijón - Asturias
administration@osisinspection.com |